TL-505 Washing Machine Heater Production Line
Detailed Product Description
Tongli Machinery Washing machine heater production line is our newly developed automatic production line. It automatically connects MgO powder filling–upper plug assembling–feeding with hi-pot test–rolling–resistance value and tube length test–turning, plug removing, pin cutting, MgO powder digging–partial annealing–polishing–M shape bending-clamping and hydraulic pressing for forming, etc This line only needs 1 person for operation and maintenance, this saves a lot of labor costs.
Notes: All the information above, which may be subject to change, is offered solely for your reference, and should not be taken as a warranty or representation for which we assume any legal responsibility.
WARRANTY | Machine for one year, electric parts for half a year, wearing parts are not included. |
---|---|
PAYMENT | 50% advance payment, 50% before shipment. |
DELIVERY TIME | Normally in 60 days after getting advance payment and all the technical parameters we request. But it depends on how many machines you wish to purchase. |
PACKING DETAILS | Merchandise is packed in sea worthy and weather proof firm wooden box. |